1) Regeneration gasoline: a mixture of hydrogen and innovative technologies glovebox inert gasoline (hydrogen accounts for five% -ten%)

two) Amount: 40L gas cylinder 10Mpa

three) Regenerative gasoline stress: .05Mpa (the gasoline intake for each 50 % hour in the condition of .05Mpa is that the cylinder pressure drops by one.5Mpa. If it exceeds 1.5Mpa, the strain of the strain regulator’s timetable will be lowered, if it is a lot less than 1.5Mpa Improve the stress of the stress regulator plan)

four) Method: three hours heating-3 several hours heating and ventilation-three hrs vacuuming-1 hour pumping-10 hrs cooling

5) Actions:

① Join the regeneration fuel (check the pipeline for leaks after relationship: just after connecting, open the primary valve of the stress cutting down valve to the maximum, open up the auxiliary meter to .1Mpa, turn off the major valve, hold out 15 minutes, if the stress of the auxiliary meter remains at .1 Mpa remains unchanged, indicating no air leakage

>②Set the strain of the auxiliary gauge of the force cutting down valve to .1Mpa (the pressure for the duration of air flow is about .06-.08MPa

>③ Close the cycle and analyz

r>④Turn on the vacuum pu

r>⑤ Begin regenerat

br>⑥ The new method ends at 20h (clean up in advance of cleaning, water and oxygen index <200p


6) Note: Do not cut off the power and gas during the regeneration process (especially the first 6 hours)! Some pressure reducing valves are not allowed, and the pressure needs to be adjusted appropriately to ensure continuous ventilation for 3 ho


7) Observation: whether the regeneration gas flowmeter shows about 20L / min, otherwise adjust the pressure of the pressure reducing valve.